The Shell Bonga FPSO was built in 2 stages. The first was the laying down of the hull and fabrication of the hull equipment in the Samsung shipyards in Korea. The second stage was the fixing of the topside equipment at Amec’s shipyard in the UK.

Click on the link below to view the FPSO Vessels - FPSO Bonga PAGA Case Study