The Tyco team designed a new IG55 gas suppression system to replace the legacy CO2 system at the Royal Hallamshire Hospital. The install team decommissioned and removed the old system, installed appropriate pressure venting and then conducted a full room integrity test as part of the project. Working alongside the team from the Trust the project was delivered on-time and onbudget protecting the client’s vital assets for the future.